1. Proposed Greengate X118 (R4 250 000) - Industrial 3 (with offices)
The portion is sold with the potential rights that apply to the specific phase. The land use rights for industrial 3 will come into effect on PROCLAMATION of the proposed Greengate Extension X118. (The proclamation of the township will be the responsibility of the buyer).
Proposed Zoning - Industrial 3 with offices, Opportunities/ Bulk - 1,0339 hectares, Area (ha)- 2,0678. Special(access), Area(ha) 0,1420
Absolute Prime Location !!!
Can be bought as a whole OR in 5 separate developments. The land use rights for the separate parcels will come into effect on PROCLAMATION of the proposed Greengate extensions. 5th Portion already Sold. Approved for Filling Station
(NB: the proclamation of the townships will be the
responsibilty of the buyer.)
LOCATION:
The property is located just off Beyers Naudé Drive (M5), approximately 2,8 kilometres south-southwest of its intersection with the N14-highway between Pretoria and Krugersdorp.
ACCESS:
the property is accessible from a single access point off Beyers Naudé Drive. This provincial road provide service roads from the main access.
DEVELOPMENT ALONG THE M5(BEYERS NAUDE DRIVE):
Several developments have been approved along Beyers Naude drive and further applications for development are pending consideration by the municipality. Services infrastructure pose a challenge at the moment but a collective agreement between developer would address many issues. The imminent upgrade of the M5 and construction of the service roads is anticipate to simulate development and unlock further development potential in the area.
APPROVAL AND STUDIES:
The following studies were undertaken as part of the application process and can be made available on request:
- Survey(with contours and aerial imaging).
- Geotechnical Survey.
- Freshwater Resource Verification.
- Terrestrial Ecological Assessment.
- Heritage Impact Assessment .
- Traffic Impact Assessment .
- Civil Outline Service Schemes Report.
- Electrical Outline Services Schemes Report.
- Flood line certification.
The following approvals have been obtained:
- Environmental Authorization.
- Subdivision Approval(Municipality)
- Subdivision Approval(Surveyor General).
- Township Approval (Municipality)
- Township Phasing (Municipality)
?? Contact me today to arrange an exclusive viewing. I can assist with pre-approval and bond applications.
Maryke Engelbrecht